Top.Mail.Ru
‘We are already thinking about long-term safety’: How Belarus minimizes waste from BelNPP
777

‘We are already thinking about long-term safety’: How Belarus minimizes waste from BelNPP

11.05.2026

Aleksandr Rakavchuk, head of the radiation safety workshop at the Belarusian Nuclear Power Plant (BelNPP), told BelTA’s The Nation Speaks project how Belarus minimizes the generation of radioactive waste.

‘All-seeing eye’ and round-the-clock readiness: Radiation safety at BelNPP
93

‘All-seeing eye’ and round-the-clock readiness: Radiation safety at BelNPP

29.04.2026

Aleksandr Rakavchuk, head of the radiation safety workshop at the Belarusian Nuclear Power Plant (BelNPP), explained how safety is ensured at the plant in a new episode of BelTA’s Nation Speaks project.


50bn kWh of electricity generated by BelNPP since launch
379

50bn kWh of electricity generated by BelNPP since launch

03.09.2025
The Belarusian nuclear power plant (BelNPP) has generated 50 billion kWh of electricity since launch, BelTA learned from Belarusian Energy Minister Denis Moroz during a press tour dedicated to the Oil, Gas and Fuel Industry Workers’ Day.
arrow
Нашы выданні

Толькі самае цікавае — па-беларуску!

Write to the editor