777
‘We are already thinking about long-term safety’: How Belarus minimizes waste from BelNPP
11.05.2026
Aleksandr Rakavchuk, head of the radiation safety workshop at the Belarusian Nuclear Power Plant (BelNPP), told BelTA’s The Nation Speaks project how Belarus minimizes the generation of radioactive waste.
93
‘All-seeing eye’ and round-the-clock readiness: Radiation safety at BelNPP
29.04.2026
Aleksandr Rakavchuk, head of the radiation safety workshop at the Belarusian Nuclear Power Plant (BelNPP), explained how safety is ensured at the plant in a new episode of BelTA’s Nation Speaks project.
379
50bn kWh of electricity generated by BelNPP since launch
03.09.2025
The Belarusian nuclear power plant (BelNPP) has generated 50 billion kWh of electricity since launch, BelTA learned from Belarusian Energy Minister Denis Moroz during a press tour dedicated to the Oil, Gas and Fuel Industry Workers’ Day.